Vaillant TURBOmax Pro 2 E Wartungshandbuch

Stöbern Sie online oder laden Sie Wartungshandbuch nach Warmwasserbereiter & Kessel Vaillant TURBOmax Pro 2 E herunter. Vaillant TURBOmax Pro 2 E Technical data Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 72
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTRUCTIONS FOR
INSTALLATION AND SERVICING
TURBOmax Pro 28/2 E
Wall hung room sealed fan assisted combination boilers
The code of practice for the installation,
commissioning & servicing of central heating systems
I
0
Seitenansicht 0
1 2 3 4 5 6 ... 71 72

Inhaltsverzeichnis

Seite 1 - TURBOmax Pro 28/2 E

INSTRUCTIONS FOR INSTALLATION AND SERVICINGTURBOmax Pro 28/2 EWall hung room sealed fan assisted combination boilersThe code of practice for the insta

Seite 2

10GENERAL REQUIREMENTSGas SupplyThe gas supplier should ensure theavailability of an adequate supply ofgas.A gas meter may only be connectedto the ser

Seite 3

11GENERAL REQUIREMENTSTop outlet flue system(100 mm outside diameter)The top outlet horizontal flue system(Art. No. 303 807) is suitable forinstallati

Seite 4 - Contents included with

12GENERAL REQUIREMENTSFlue terminationThe following details refer to bothflue systems.a. The terminal must be positionedsuch that the products of comb

Seite 5 - EC designation

13GENERAL REQUIREMENTSCupboard or compartmentventilationTURBOmax Pro combination boilersare very high efficiency appliances.As a consequence the heat

Seite 6 - Technical data

14GENERAL REQUIREMENTSGuide to system requirementsWater circulation systemDetailed recommendations for thewater circulation system are given inBS 6798

Seite 7 - Boiler connections

15GENERAL REQUIREMENTSExpansion vesselThe 28 kW boiler incorporates a 10 litre expansion vessel which is suitable for a sealed heating systemwith a ma

Seite 8 - Functional Diagram

16GENERAL REQUIREMENTS0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 140050100150200250300350400450500550600650700Volume flow [l/min]Lift [

Seite 9 - Related Documents

17GENERAL REQUIREMENTS15052005005I00120609030°Cbar43210Euro B/S 022/1440800338I00 120609030°Cbar43210Euro B/S 023/1GeneralPreparation of boiler locati

Seite 10 - Boiler location

55210124163 03240/242/280/282/824/828 Pro/Plus60/10007/2000124163_0313218BOILER INSTALLATION SEQUENCEUsing boiler templateFix the paper template to th

Seite 11 - Fig. R.4: Art.-No. 303 817

I033201312226,527131105105120120609030°Cbar43210Euro B/S 043/119BOILER INSTALLATION SEQUENCEFig. I.4: Fitting the boilerFitting the boiler● Lift the b

Seite 12

2TABLE OF CONTENTSIntroductionBoiler SpecificationGeneral RequirementsBoiler Installation SequenceGeneral information . . . . . . . . . . . . . . . .

Seite 13 - Electrical supply

3I02I090°90°1Euro B/S 041/1Fig. I.5: Remove of boiler casing20BOILER INSTALLATION SEQUENCERemoving boiler casing● Turn both securing fasteners (1)anti

Seite 14 - Guide to system

21BOILER INSTALLATION SEQUENCEGas supply● Connect the 15 mm compressiongas service cock (1) supplied withappliance and tighten.● Connect a gas supply

Seite 15

22BOILER INSTALLATION SEQUENCECold water mains inletand hot water outletFlush all foreign matter from the mainssupply before connecting to the boiler.

Seite 16 - System by-pass

23BOILER INSTALLATION SEQUENCECentral heating flow andreturn pipeworkBefore connecting the heating circuitto the boiler appliance, all pipeworkand rad

Seite 17 - Euro B/S 023/1

24BOILER INSTALLATION SEQUENCEElectrical installationGeneral requirementsAll electrical work shall be carried outby a competent person and shall compl

Seite 18 - 124163_03

25BOILER INSTALLATION SEQUENCECautionMains connection terminals Land N remain live even whenthe boiler on/off control isswitched off.● Refit the termi

Seite 19 - Fig. I.4: Fitting the boiler

26BOILER INSTALLATION SEQUENCEEuro B/S 048/1Socket X2 for internal unit componentsSocket X4 for minority reversing valveSocket X7 for accessory box co

Seite 20 - Removing boiler casing

27BOILER INSTALLATION SEQUENCEControlsExternal electrical controlsThe boiler terminals 3, 4 and 5 arefor connecting external electrical controls such

Seite 21 - Gas supply

28BOILER INSTALLATION SEQUENCEFor optimum fuel economy it is recommended that where TRV’s areused they are used in conjunctionwith a programmable room

Seite 22 - Cold water mains inlet

29BOILER INSTALLATION SEQUENCEFit boiler casing● Carefully push case (1) onto theboiler such that the locating pointseither side at the top of the boi

Seite 23 - Connect the flue system

3TABLE OF CONTENTSGas supply adjustments(Commissioning Part II)ServicingFault FindingIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . .

Seite 24 - General requirements

30COMMISSIONING PART IPreliminary electricalchecksCheck the electrical installation bycarrying out short circuit, earth continuity and resistance to e

Seite 26 - Electronic board layout

32COMMISSIONING PART I2534Fig. Com. 1: Draining the heating systemEor B/S 207/0GB_Pro

Seite 27 - Controls

33COMMISSIONING PART IInitial system flush(„cold“)The whole of the heating system mustbe flushed out at least twice: oncecold, and once hot as instruc

Seite 28

34GAS SUPPLY ADJUSTMENTS(COMMISSIONING PART II)12Euro B/S 034/0Gas inlet workingpressureTo check the gas inlet working pressu-re:● Lower the front pan

Seite 29 - Fit boiler casing

35GAS SUPPLY ADJUSTMENTS(COMMISSIONING PART II)1a1323a2aEuro B/S 035/0Main burner pressure● The burner pressure on this appliance has been factory set

Seite 30 - Water supply

36GAS SUPPLY ADJUSTMENTS(COMMISSIONING PART II)Adjusting the centralheating output (range rating)The TURBOmax Pro is fully modulating for central heat

Seite 31

37GAS SUPPLY ADJUSTMENTS(COMMISSIONING PART II)1)15 °C, 1013 mbar, dry2)The nozzles are stamped with the values shown inthis table. The marking corres

Seite 32

38FUNCTIONAL CHECKS(COMMISSIONING PART III)I0Functional checksProcedureOnce the unit has been installed andthe gas supply has been checked,operate the

Seite 33 - Filling the heating

39FUNCTIONAL CHECKS(COMMISSIONING PART III)OperationThe Vaillant TURBOmax Pro is equipped with a set of diagnosticindicator lights to show the operati

Seite 34 - Gas inlet working

4LIST OF CONTENTSContents included withboilerEnsure that all contents are includedbefore commencing installation.DO NOT remove the boiler from thepoly

Seite 35 - Main burner pressure

40FUNCTIONAL CHECKS(COMMISSIONING PART III)Heating system● Ensure that the power on indicatoris illuminated (1).● Ensure that the maximum radiatortemp

Seite 36 - (range rating)

41FUNCTIONAL CHECKS(COMMISSIONING PART III)Adjusting pump speedThe unit is fitted with a two-speedpump.The pump is delivered with the switch(1) set to

Seite 37 - Burner pressure and Gas

42FUNCTIONAL CHECKS(COMMISSIONING PART III)Set the maximum radiator temperaturecontrol to the desired setting.Set the maximum hot water temperature co

Seite 38 - Functional checks

SERVICING43Before commencing any servicing ormaintenance work, carry out an initialinspection of the system as follows:● Inspect the flue, pipework an

Seite 39 - Operation

44SERVICINGCleaning the burner andprimary heat exchanger● Turn off the boiler.● Isolate the electrical supply to theboiler.● Remove the boiler case as

Seite 40

45PARTS REPLACEMENTEnsure that ALL regulationsare observed.Fig. E.1: GeneralEuro B/S 006/0GBSafety instructions The following safety instructions are

Seite 41 - Adjusting pump speed

4613452Euro B/S 158/1Electrodes● Refer to the important informationand initial preparation on page 45.● Remove combustion chambercover by unclipping t

Seite 42 - Handing over to the user

47PARTS REPLACEMENT124389576Fig. E.4: FanEuro B/S 162/0Fan● Refer to the important informationand initial preparation on page 45.● Remove combustion c

Seite 43 - Initial Inspection

483126574Euro B/S 297/0910813141112Euro B/S 298/0PARTS REPLACEMENTFig. E.5a: Gas valveFig. E.5b: Gas valveGas valve● Refer to the important informatio

Seite 44 - Cleaning the burner and

49PARTS REPLACEMENTTemperature sensors(NTC’S)● Refer to the important informationand initial preparation on page 45.● Identify which sensor(s) is to b

Seite 45 - Initial preparation

5INTRODUCTIONThe TURBOmax Pro is a fully automatic, wall mounted, room sealedcombination boiler for central heatingand domestic hot water. Domestic ho

Seite 46 - Electrodes

50PARTS REPLACEMENT1423Fig. E.8: Expansion vesselEuro B/S 164/0Expansion vesselPlease note: In the unlikely event of afailure of the CH expansion vess

Seite 47

51PARTS REPLACEMENTElectronic control board● Refer to the important informationand initial preparation on page 45.● Lower control box. ● Unclip the te

Seite 48 - Gas valve

52Air pressure switch● Refer to the important informationand initial preparation on page 45.● Remove clips (6) and lift out pressure switch (7).● Disc

Seite 49 - Main heat exchanger

53System bypass● Refer to the important informationand initial preparation on page 45.● Release central heating water pressure.● Remove spring clip (2

Seite 50 - Expansion vessel

54PARTS REPLACEMENT221Fig. E.15: Pressure gaugeEuro B/S171/014635Fig. E.16: Aqua sensorEuro B/S 172/0GB_ProPressure gauge● Refer to the important info

Seite 51 - Main transformer

55PARTS REPLACEMENTDHW heat exchanger ● Refer to the important informationand initial preparation on page 45.● Release central heating water pressure.

Seite 52 - Air pressure switch

56I0Fig. E.19: Functional checkEuro B/S 058/0Checking functionsProcedureOn completion operate the system runto ensure that the boiler is workingcorrec

Seite 53 - Diverter valve

57FAULT FINDINGFlame indicator (yellow)Illuminates when flame is recognisedby the flame monitoring system.(A flashing indicator shows that anNTC senso

Seite 54 - Aqua sensor

58FAULT FINDINGEnsure boiler mainON/OFF control is setto position "1" Yes Go to sheet CCheck electrical supply, appliance fuses and on/off c

Seite 55 - Pressure relief valve

59FAULT FINDINGSheet BCheck operation of pump and fanTurn off the main ON/OFF control to the"0" positionDiconnect the power supply to the bo

Seite 56 - Checking functions

6BOILER SPECIFICATIONTechnical dataTURBOmax Pro 28/2 E( VUW GB 282/2-3)UnitsCH heat output range (80/60 °C)10.4 - 28 (35 500 - 95 500)kW (Btu/h)DHW he

Seite 57 - Fault finding

60FAULT FINDINGCheck central heating and controlsEnsure that radiator temperature control knobis set to vertical position and that any internaltimer (

Seite 58

61FAULT FINDINGDoes fan run after approx. 30 secs.?Check flue and ignition systemNoCheck pitot tube (in fan outlet) and airhoses are not obstructed an

Seite 59

62FAULT FINDINGCheck gas valve and central heating system pressureDoes burner light 1stattempt?Does burner light within 3ignition attempts?NoYesCheck

Seite 60

63FAULT FINDINGDoes flame indicator glow andflames increase in size to full gasrate after approx. 2 mins?YesDoes burner flame modulate/ goout when rad

Seite 61

64FAULT FINDINGDraw hot water at high rate YesCheck hot water flow rate and temperature.Compare with technical data, if flow is notsufficient check in

Seite 62

65FAULT FINDING

Seite 63

66DIAGRAMSPOWER SUPPLYF2AL2N1MAIN SWITCHMAINTRANSFORMER230V20VAIRPRESSURESWITCHFANPUMPNTC FLOWTEMPERATURESENSORFLAMESENSORGASVALVEAQUASENSORF1,25ANTC

Seite 64

67DIAGRAMSSwitchgear cabinetU100X3T 2= F2T 1,25 = F3X2X2X1242311213141516171819202122234567891011X6DiagnosisX2AquasensorPressure sensorNTC returnNTC e

Seite 65

68SHORT PARTS LISTDescription Part No. Key No.Burner, natural gasBurner chamber group: 031501Distributor tube: 126753 Er.1Ignition electrodeFlame sens

Seite 66 - DIAGRAMS

69SHORT PARTS LISTEr.1 Er.3Er.4 Er.6Er.7 Er.8 Er.9Er.10 Er.11 Er.12Euro B/S 143/0Euro B/S 148/0Euro B/S 147/0Euro B/S 146/0Euro B/S 156/0Euro B/S 152/

Seite 67

7BOILER SPECIFICATIONBoiler connections0763105921456510010035 3543213018011488543 21Fig. B.1: Connection diametersEuro B/S 024/2Key:1 Heating system r

Seite 68 - SHORT PARTS LIST

70SHORT PARTS LISTEr.13 Er.14Er.17Er.15Euro B/S 149/0Euro B/S 145/0Euro B/S 178/0Euro B/S 150/0Er.16Euro B/S 155/1

Seite 70

83 41 11 GB11 · 02/2002 Mü · Printed on 100 % recycled paper · Subject to alterationHead OfficeVaillant Ltd., Vaillant House,Medway City Estate, Trid

Seite 71

8BOILER SPECIFICATIONCC123456789101112131415171618192122232425262728293031Functional Diagram1 Air duct2 Fan3 Main heat exchanger4 Temperature sensor (

Seite 72

9GENERAL REQUIREMENTSEnsure that ALL regulationsare observed.Fig. R.1Euro B/S 006/0_GBRelated DocumentsThe installation of the boiler must bein accord

Kommentare zu diesen Handbüchern

Keine Kommentare